'''This tutorial will show how to add cuts to tubes in an assembly project.''' | '''This tutorial will show how to add cuts to tubes in an assembly project.''' | ||
− | ''Note | + | '''(Note) Inches are used as the measurement units throughout this tutorial.''' |
__NOTOC__ | __NOTOC__ | ||
[[File:cut_tut_01.png|right|500px]] | [[File:cut_tut_01.png|right|500px]] | ||
Line 11: | Line 11: | ||
;1) [[PickPoints]] | ;1) [[PickPoints]] | ||
− | :PICKPOINTS ARE USED FOR EVERYTHING. The | + | :PICKPOINTS ARE USED FOR EVERYTHING. The Assembly part of the software is largely run in full 3D. Because a computer screen is only 2D, there is an unlimited amount of depth behind and in front of the cursor. A PickPoint is a point in 3D space that can be used for creating, editing, and placing parts in handrail design. PickPoints can be placed in a 2D environment by having their depth manually entered in the appropriate value fields. |
:*There are 2 types of PickPoints; Those automatically created by the part by default (various colors) and user-defined points (green). In addition, the initial (0,0,0) point is an automatic point that resides at the center of the Tri-Star. The Tri-Star is our directional definition locator. | :*There are 2 types of PickPoints; Those automatically created by the part by default (various colors) and user-defined points (green). In addition, the initial (0,0,0) point is an automatic point that resides at the center of the Tri-Star. The Tri-Star is our directional definition locator. | ||
Line 43: | Line 43: | ||
==Part Design== | ==Part Design== | ||
− | 1 | + | 1. |
[[File:cut_tut_02.png|right|300px]] | [[File:cut_tut_02.png|right|300px]] | ||
*Before starting, we need to put a few parts together so that we have something to cut. | *Before starting, we need to put a few parts together so that we have something to cut. | ||
+ | |||
+ | |||
Line 60: | Line 62: | ||
− | 2 | + | |
+ | |||
+ | |||
+ | |||
+ | |||
+ | 2. | ||
[[File:cut_tut_03.png|right|700px]] | [[File:cut_tut_03.png|right|700px]] | ||
*Select the "'''Set Reference'''" [[File:set_reference.png]] button and click the point at the center of the Tri-Star in the display area (this should be the only point on the display area right now). If you successfully select the point, it will turn red. | *Select the "'''Set Reference'''" [[File:set_reference.png]] button and click the point at the center of the Tri-Star in the display area (this should be the only point on the display area right now). If you successfully select the point, it will turn red. | ||
+ | |||
+ | |||
Line 74: | Line 83: | ||
− | 3 | + | |
+ | |||
+ | 3. | ||
[[File:cut_tut_04.png|right|700px]] | [[File:cut_tut_04.png|right|700px]] | ||
*Select the "'''Clear Values'''" button. | *Select the "'''Clear Values'''" button. | ||
+ | |||
+ | |||
Line 89: | Line 102: | ||
− | 4 | + | |
+ | |||
+ | 4. | ||
[[File:cut_tut_05.png|right|700px]] | [[File:cut_tut_05.png|right|700px]] | ||
*Leave "'''12'''" in the light green "'''Right'''" value field and type "'''8'''" in the darker blue "'''Front'''" value field. | *Leave "'''12'''" in the light green "'''Right'''" value field and type "'''8'''" in the darker blue "'''Front'''" value field. | ||
+ | |||
+ | |||
Line 103: | Line 120: | ||
− | 5 | + | |
+ | 5. | ||
[[File:cut_tut_06.png|right|700px]] | [[File:cut_tut_06.png|right|700px]] | ||
*Select the "'''Clear Values'''" button. | *Select the "'''Clear Values'''" button. | ||
+ | |||
Line 117: | Line 136: | ||
− | 6 | + | |
+ | 6. | ||
[[File:cut_tut_08.png|right|540px]] | [[File:cut_tut_08.png|right|540px]] | ||
*Select the '''Straight Part''' [[File:Straight_part1.png]] button. | *Select the '''Straight Part''' [[File:Straight_part1.png]] button. | ||
Line 124: | Line 144: | ||
− | *'''Connect the two points''' that are indicated in the picture | + | *'''Connect the two points''' that are indicated in the picture to the right. |
− | 7 | + | 7. |
[[File:cut_tut_09.png|right]] | [[File:cut_tut_09.png|right]] | ||
− | *'''Connect the two points''' that are indicated in the picture | + | *'''Connect the two points''' that are indicated in the picture to the right. |
Line 142: | Line 162: | ||
− | 8 | + | 8. |
[[File:cut_tut_10.png|right|540px]] | [[File:cut_tut_10.png|right|540px]] | ||
− | *'''Connect the two points''' that are indicated in the picture | + | *'''Connect the two points''' that are indicated in the picture to the right. |
'''You are now finished building the part.''' | '''You are now finished building the part.''' | ||
Line 156: | Line 176: | ||
==Cutting== | ==Cutting== | ||
− | 1 | + | 1. |
[[File:cut_tut_11.png|left|250px]] | [[File:cut_tut_11.png|left|250px]] | ||
*Select the '''Cutting''' tab. | *Select the '''Cutting''' tab. | ||
Line 178: | Line 198: | ||
− | 2 | + | |
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | 2. | ||
[[File:cut_tut_12.png|right]] | [[File:cut_tut_12.png|right]] | ||
*Select the "'''New Cut'''" [[File:new_cut.png]] button. | *Select the "'''New Cut'''" [[File:new_cut.png]] button. | ||
Line 193: | Line 222: | ||
− | 3 | + | |
+ | |||
+ | 3. | ||
[[File:cut_tut_13.png|right|700px]] | [[File:cut_tut_13.png|right|700px]] | ||
Line 204: | Line 235: | ||
− | 4 | + | |
+ | |||
+ | 4. | ||
[[File:cut_tut_14.png|right]] | [[File:cut_tut_14.png|right]] | ||
*Select the "'''New Cut'''" [[File:new_cut.png]] button, again. | *Select the "'''New Cut'''" [[File:new_cut.png]] button, again. | ||
Line 218: | Line 251: | ||
− | 5 | + | |
+ | |||
+ | 5. | ||
[[File:cut_tut_15.png|right|700px]] | [[File:cut_tut_15.png|right|700px]] | ||
*The second cut will then be added to the '''Cut List'''. | *The second cut will then be added to the '''Cut List'''. | ||
Line 232: | Line 267: | ||
− | 6 | + | |
+ | |||
+ | 6. | ||
[[File:cut_tut_16.png|right|500px]] | [[File:cut_tut_16.png|right|500px]] | ||
'''You are now finished adding cuts to the part.''' | '''You are now finished adding cuts to the part.''' |
Latest revision as of 07:53, 22 September 2014
This tutorial will show how to add cuts to tubes in an assembly project.
(Note) Inches are used as the measurement units throughout this tutorial.
Things To Know
- "This tutorial is designed to walk the user through creating an assembly design and cutting parts to fit together. As you go through this tutorial, later procedures will assume that you understand all earlier procedures. Because of this, it is very important that you carefully step through this guide, understanding everything along the way and following all steps in order."
- "A few key items need to be addressed before starting the step-by-step instructions of this tutorial. It is very important for Bend-Tech users to completely understand these items:"
- 1) PickPoints
- PICKPOINTS ARE USED FOR EVERYTHING. The Assembly part of the software is largely run in full 3D. Because a computer screen is only 2D, there is an unlimited amount of depth behind and in front of the cursor. A PickPoint is a point in 3D space that can be used for creating, editing, and placing parts in handrail design. PickPoints can be placed in a 2D environment by having their depth manually entered in the appropriate value fields.
- There are 2 types of PickPoints; Those automatically created by the part by default (various colors) and user-defined points (green). In addition, the initial (0,0,0) point is an automatic point that resides at the center of the Tri-Star. The Tri-Star is our directional definition locator.
- 2) Center Line & Apex
-
- Center Line: In the assembly design environment we are not working exclusively with the "center-line" of a part, but rather more with the inside or outside.
- Apex: Most bend locations are created in handrail design with the "Apex". Our definition of apex is the intersection of the straight tubes as if there wasn’t a radius.
- This is demonstrated in the picture below.
- 3) Locational Orientation
-
- Designing seems to work the best if users imagine as if they are standing at a 45 degree angle to the desired creation. This way left is left and right is right. Take a minute and examine the Tri-Star (under the PickPoints] tab) to get your orientation.
Start Up
1) Start by double clicking the "Bend-Tech 7x" icon to start up the program.2) Select the "Assembly" icon in the Task Menu under the "Create New" section to open the Assembly interface. The window that opens should be labeled [Assembly - 1].
3) For the purposes of this tutorial, click the "Maximize" button at the top right of the Assembly window.
4) Also, for the purposes of this tutorial, zoom out significantly by spinning the wheel on your mouse so that the Tri-star is about the size of a pea in the lower left corner of the display area.
5) For the purposes of this tutorial. The "Die & Material" tab is located in the upper left corner of the window. Select the "1.00 Material" and "2.0 Die" as seen here.
Part Design
1.
- Before starting, we need to put a few parts together so that we have something to cut.
- Select the "PickPoints" tab and the "Single" sub-tab.
2.
- Select the "Set Reference" button and click the point at the center of the Tri-Star in the display area (this should be the only point on the display area right now). If you successfully select the point, it will turn red.
3.
- Select the "Clear Values" button.
4.
- Leave "12" in the light green "Right" value field and type "8" in the darker blue "Front" value field.
5.
- Select the "Clear Values" button.
- Type "12" in the darker blue "Front" value field, also type "12'" in the light green "Right" value field, then select Apply .
6.
- Connect the two points that are indicated in the picture to the right.
7.
- Connect the two points that are indicated in the picture to the right.
8.
- Connect the two points that are indicated in the picture to the right.
You are now finished building the part.
Cutting
1.
- Select the Cutting tab.
2.
- Next, select the Left tube in the display area. This will be the tube that is cut (highlighted green). Now, select the middle tube. This tube will define how the first tube is cut (red tube).
3.
- The cut will be added to the Cut List.
- Zoom in on the part model to see a better view of the cut outline. The cutting profile will be represented by the blue and black lines.
4.
- Select the right tube, followed by the middle tube to define a second cut.
5.
- The second cut will then be added to the Cut List.
- Again, zoom in on the part model to see a better view of the cut outline. The cutting profile will be represented by the blue and black lines.
6.
You are now finished adding cuts to the part.